Self-adhesive membrane on the mortar

1. 2 self-adhesive waterproof membrane on 2.0mm

- Waterproofing membrane is a high density Polyten compounds and compound bitumen / rubber stamping. Absolutely effective for walls, floors and commercial center, Seno, roofs, domes and sloping roofs.

Especially effective for waterproofing basements.

Can use the membrane for both wet and dry surfaces.

2. A self-adhesive waterproof membrane on 1.0mm & 1.5mm

- Waterproofing membrane is a high density Polyten compounds (aluminum foil rolled Polyten terephthalated / PET ...) and compounds that asphalt / rubber stamping.

That membrane is used for walls, floors and business center, roof, dome and roof slope.

Especially effective for waterproofing basements.

Can use the membrane for both wet and dry surfaces.

Features Value
Size:
Width:    1.0 m ~ 2.0 m
Thickness: 1.0m m ~ 1.2m m ~ 1.5 mm
Length: 10 m ~ 50 m/cuộn
Membrane surface: HDPE
Can be applied to the surface of the steel, cement (dry and wet) and wood
Surface HDPE
Width 1.0m~2.0m
Thickness 1.0mm (1.0~2.0mm)
Surface tension (only for membranes) 200N/50mm min
Absolute elongation 300~450% min
Adhesive edge 2.0 N/mm min
Sticky layer of paper 1.5N/mm min

SELF MEMBRANE 1.0MM & 1.5 MM

Membrane is a high density Polyten compounds (aluminum foil rolled Polyten terephthalated / PET ...) and compound bitumen / rubber membrane dan.Do is used for walls, floors of commercial TT , roof, dome and roof slope. Can use the membrane for both wet and dry surfaces.

FEATURES
- Easy to transport and use
- Guide - do not use heat, avoid fire hazards.

User Guide
The steps of construction for the dry surface


1. The surface to be treated must be clean, dry, smooth, not rough prior to application.

Use brushes to wipe the hard rubbish, dust on the surface to be treated


2. Using the roller rolling surfaces are concrete. After the concrete to dry using waterproof membrane.

 

 



3. Considering the membrane sides in each particular area




4. Spread sheets and glued on the surface as to prevent the air vents and make sure the entire surface to be sealed.








5. Edge of the first and last edge of sheets to overlap at least 60mm to ensure the entire surface to be treated has been completely sealed.




 


Image construction


The steps of construction for wet surfaces

A step change / major breakthrough in the field of waterproofing in the world today

Wet membrane was done while the concrete is still wet. Summons a mortar onto the concrete surface is still wet, then paste the right membrane on the mortar. This stage may take more time and avoid the phenomenon of rapid evaporation.